As a result of the construction of the Saylorville Dam and Reservoir on the Des Moines River, six highway bridges crossing the river were scheduled for removal. One of these, an old pin-connected, high-truss, single-lane bridge, was selected for a comprehensive testing program which included ultimate load tests, service load tests, and a supplementary test program. A second bridge was used for a limited service load test program. The results of the research are detailed in two interim reports. The first interim report outlines the ultimate load tests and the second interim report details the results of the service load and supplementary test program. This report presents a summary of these findings along with recommendations for implementation of the findings. |
Keywords |
|
Source Agency |
|
NTIS Subject Category |
|
Corporate Authors |
Iowa State Univ., Ames. Engineering Research Inst.; Iowa State Dept. of Transportation, Ames.; Federal Highway Administration, Ames, Iowa. Iowa Div. |
Supplemental Notes |
Sponsored in part by Iowa State Dept. of Transportation, Ames. See also report dated May 75, PB-244 704. |
Document Type |
Technical Report |
Title Note |
Summary rept. 1 Apr 74-30 Sep 75. |
NTIS Issue Number |
197608 |