Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the process and project engineering design of the Demonstration Plant. The design has been completed and is being reported in 24 volumes. This is Volume 22 which reports the design of Plant Section 4000 - Electrical and Communications. The electrical facilities for the Demonstration Plant are a complete installation including power sources, distribution, lighting, telephone, fire alarm, communications, and aircraft warning systems. The design, materials, equipment, and installation of the electrical facilities are in accordance with the latest edition of applicable codes and regulations. The main source of power for the plant will be through a tie-in to a 138kv line operated by a public utility. This power line crosses the southern edge of the plant site. Emergency power will be generated with a 500kw diesel driven generator. Backup emergency instrument power will be supplied by a UPS (battery-inverter) system. (ERA citation 06:026776) |
| Keywords |
|
| Source Agency |
|
| NTIS Subject Category |
|
| Corporate Authors |
Conoco, Inc., Stamford, CT.; Department of Energy, Washington, DC.; Foster Wheeler Energy Corp., Livingston, NJ. |
| Document Type |
Technical Report |
| NTIS Issue Number |
198125 |
| Contract Number |
|