Publication Date |
2008 |
Personal Author |
Duncan, J. B.; Burke, S. P. |
Page Count |
64 |
Abstract |
This report delineates the results obtained from laboratory testing of IONISIV(reg(underscore)sign) IE-95 to determine the efficacy of the zeolite for the removal of radioactive cesium from the KE Basin water prior to transport to the Effluent Treatment Facility, as described in RPP-PLAN-36158, IONSIV(reg(underscore)sign) IE-95 Studies for the removal of Radioactive Cesium from KE Basin Spent Nuclear Fuel Pool during Decommissioning Activities. The spent nuclear fuel was removed from KE Basin and the remaining sludge was layered with a grout mixture consisting of 26% Lehigh Type I/II portland cement and 74% Boral Mohave type F fly ash with a water-to-cement ratio of 0.43. The first grout pour was added to the basin floor to a depth of approximately 14 in. covering an area of 12,000 square feet. A grout layer was also added to the sludge containers located in the attached Weasel and Technical View pits. |
Keywords |
|
Source Agency |
|
Corporate Authors |
CH2M Hill Hanford Group, Inc., Richland, WA.; Department of Energy, Washington, DC.; Fluor Hanford, Richland, WA. |
Supplemental Notes |
Prepared in cooperation with Fluor Hanford, Richland, WA. Sponsored by Department of Energy, Washington, DC. |
Document Type |
Technical Report |
NTIS Issue Number |
200825 |
Contract Number |
|