National Technical Reports Library - NTRL

National Technical Reports Library

The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload XML
Download

Preliminary Estimation of Isotopic Inventories of 2000 MWt ABR (Revision 1).


DE2008932948

Publication Date 2008
Personal Author Kim, T. K.; Yang, W. S.
Page Count 66
Abstract The isotopic inventories of a 2000 MWt Advanced Burner Reactor (ABR) core have been estimated to support the ABR accident analysis to be reported in the Appendix D of the Programmatic Environmental Impact Statement (PEIS). Based on the Super-PRISM design, a preliminary core design of 2000 MWt ABR was developed to achieve a one-year cycle length with 3-batch fuel management scheme. For a bounding estimation of transuranics (TRU) inventory, a low TRU conversion ratio ((approx.) 0.3) was targeted to increase the TRU enrichment. By changing the fuel compositions, isotopic inventories of mass and radioactivity were evaluated for four different core configurations: recycled metal fuel core, recycled oxide fuel core, startup metal fuel core, and startup oxide fuel core. For recycled cores, the TRU recovered from ABR spent fuel was used as the primary TRU feed, and the TRU recovered from 10-year cooled light water reactor spent fuel was used as the makeup TRU feed. For startup cores, weapons-grade plutonium was used as TRU feed without recycling ABR spent fuel. It was also assumed that a whole batch of discharged fuel assemblies is stored in the in-vessel storage for an entire irradiation cycle. For both metal and oxide fuel cores, the estimated TRU mass at beginning of equilibrium cycle (BOEC), including spent fuel TRU stored in the in-vessel storage, was about 8.5-8.7 MT for the recycled cores and 5.2 MT for the startup cores.
Keywords
  • Isotopes
  • Inventories
  • Accidents
  • Burners
  • Conversion ratio
  • Decay
  • Design
  • Environmental impact statements
  • Fisson products
  • Fuel assemblies
  • Fuel management
  • Heavy metals
  • Irradiation
  • Oxides
  • Plutonium
  • Radioactivity
  • Recycling
  • Spent fuels
  • Storage
  • Water
  • Reactor cores
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors Argonne National Lab., IL. Nuclear Engineering Div.; Department of Energy, Washington, DC.
Supplemental Notes Sponsored by Department of Energy, Washington, DC.
Document Type Technical Report
NTIS Issue Number 200826
Contract Number
  • DE-AC02-06CH11357
Preliminary Estimation of Isotopic Inventories of 2000 MWt ABR (Revision 1).
Preliminary Estimation of Isotopic Inventories of 2000 MWt ABR (Revision 1).
DE2008932948

  • Isotopes
  • Inventories
  • Accidents
  • Burners
  • Conversion ratio
  • Decay
  • Design
  • Environmental impact statements
  • Fisson products
  • Fuel assemblies
  • Fuel management
  • Heavy metals
  • Irradiation
  • Oxides
  • Plutonium
  • Radioactivity
  • Recycling
  • Spent fuels
  • Storage
  • Water
  • Reactor cores
  • Technical Information Center Oak Ridge Tennessee
  • DE-AC02-06CH11357
Loading