National Technical Reports Library - NTRL

National Technical Reports Library

The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload PDF
Download

Closure of the Fast Flux Test Facility: Current Status and Future Plans.


DE2005838775

Publication Date 2005
Personal Author Burke, T. M.; Farabee, O. A.; Crow, S. H.; Witherspoon, W. V.
Page Count 16
Abstract Deactivation activities are currently in progress at the Fast F1ux Test Facility. These deactivation activities are intended to remove most hazardous materials and prepare the facility for final disposition. The two major hazards to be removed are the nuclear fuel and the alkali metal (mostly sodium) coolant. The fuel and coolant removal activities are proceeding well and are expected to be complete in 2006. Plant systems are being shut down as allowed by completion of various fuel and coolant removal actions. A Decommissioning Environmental Impact Statement is in progress to evaluate a range of potential final disposition end states.
Keywords
  • Fast Flux Test Facility
  • Deactivation
  • Closure
  • FFTF reactor
  • Hazardous materials
  • Radioactive waste management
  • Deconamination
  • Nuclear fuel
  • Alkali metals
  • Coolants
  • Sodium
  • Decommissioning
  • Fluor Hanford
  • Fast Flux Test Facility (FFTF)
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors Fluor Hanford, Richland, WA.; Department of Energy, Washington, DC. Office of Environmental Management.
Supplemental Notes Sponsored by Department of Energy, Washington, DC. Office of Environmental Management.
Document Type Technical Report
NTIS Issue Number 200603
Closure of the Fast Flux Test Facility: Current Status and Future Plans.
Closure of the Fast Flux Test Facility: Current Status and Future Plans.
DE2005838775

  • Fast Flux Test Facility
  • Deactivation
  • Closure
  • FFTF reactor
  • Hazardous materials
  • Radioactive waste management
  • Deconamination
  • Nuclear fuel
  • Alkali metals
  • Coolants
  • Sodium
  • Decommissioning
  • Fluor Hanford
  • Fast Flux Test Facility (FFTF)
  • Technical Information Center Oak Ridge Tennessee
Loading