The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload XML
Download

Field Demonstration of a Membrane Process to Separate Nitrogen from Natural Gas: Ninth Quarterly Progress Report.


DE2005831185

Publication Date 2004
Personal Author Lokhandwala, K.
Page Count 12
Abstract The original proposal described the construction and operation of a 1 MMscfd treatment system to be operated at a Butcher Energy gas field in Ohio. The gas produced at this field contained 17% nitrogen. During pre-commissioning of the project, a series of well tests showed that the amount of gas in the field was significantly smaller than expected and that the nitrogen content of the wells was very high (25 to 30%). After evaluating the revised cost of the project, Butcher Energy decided that the plant would not be economical and withdrew from the project. Since that time, Membrane Technology and Research, Inc. (MTR) has signed a marketing and sales partnership with ABB Lummus Global, a large multinational corporation. MTR will be working with the company's Randall Gas Technology group, a supplier of equipment and processing technology to the natural gas industry. Randall's engineering group has found a new site for the project at a North Texas Exploration (NTE) gas processing plant. The plant produces about 1 MMscfd of gas containing 24% nitrogen. The membrane unit will bring this gas to 4% nitrogen for delivery to the pipeline. The membrane skid is being built by ABB. NTE has ordered the required compressor and MTR is making the membrane modules. The membrane skid is scheduled to be completed by December 29. Our target is to have the unit installed and optimized by mid-January.
Keywords
  • Natural gas
  • Exploration
  • Processing
  • Nitrogen
  • Compressors
  • Construction
  • Sales
  • Targets
  • Texas
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors Membrane Technology and Research, Inc., Menlo Park, CA.; Department of Energy, Washington, DC.
Supplemental Notes Sponsored by Department of Energy, Washington, DC.
Document Type Technical Report
Title Note Rept. for 1 Apr 04-30 Jun 04.
NTIS Issue Number 200523
Field Demonstration of a Membrane Process to Separate Nitrogen from Natural Gas: Ninth Quarterly Progress Report.
Field Demonstration of a Membrane Process to Separate Nitrogen from Natural Gas: Ninth Quarterly Progress Report.
DE2005831185

  • Natural gas
  • Exploration
  • Processing
  • Nitrogen
  • Compressors
  • Construction
  • Sales
  • Targets
  • Texas
  • Technical Information Center Oak Ridge Tennessee
Loading