National Technical Reports Library - NTRL

National Technical Reports Library

The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload PDF
Download

First Step in the Final Shutdown of the UP1 Plant: Rinsing with Chemical Reagents.


DE2004828263

Publication Date 2002
Personal Author Moulin, J. P.; Hubert, N.; Huot, M.; Chany, P.; Oriol, C.
Page Count 12
Abstract The COGEMA UP1 reprocessing plant commissioned at Marcoule, France in 1958 handled roughly 20,000 metric tons of fuel from gas-cooled and research reactors. The commercial reprocessing activities of the UP1 plant ended in December 1997. CODEM, a joint venture created by the former users of the UP1 plant, including the utility Electricite de France (EDF), the French Atomic Energy Commission (CEA) and COGEMA, was established to fund and supervise decommissioning of the plant. COGEMA was selected as the industrial operator of the decommissioning project, which is scheduled to span a period of about 40 years. COGEMA, with its CODEM partners, had made the decision to proceed to a 'Final Shutdown' of the plant within a few years after the end of commercial operation. Final shutdown is intended to remove remaining fissile matter and highly radioactive materials, as well as some equipment, from the plant to ease the plant monitoring requirements compared with those applied when the plant was in operation.
Keywords
  • Fuel reprocessing plants
  • Chemical reagents
  • Decommissioning
  • Decontamination
  • Radioactive materials
  • Research reactors
  • Shutdown
  • Monitoring
  • Waste management
  • Hot spots
  • Joint ventures
  • Nuclear energy
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors SGN, Saint Quetin-en-Yvelines Cedex, (France).; Department of Energy, Washington, DC.; COGEMA, Cedex, (France).; CODEM, Ceze, (France).
Supplemental Notes Prepared in cooperation with COGEMA, Cedex, (France). and CODEM, Ceze, (France). Sponsored by Department of Energy, Washington, DC.
Document Type Technical Report
NTIS Issue Number 200508
First Step in the Final Shutdown of the UP1 Plant: Rinsing with Chemical Reagents.
First Step in the Final Shutdown of the UP1 Plant: Rinsing with Chemical Reagents.
DE2004828263

  • Fuel reprocessing plants
  • Chemical reagents
  • Decommissioning
  • Decontamination
  • Radioactive materials
  • Research reactors
  • Shutdown
  • Monitoring
  • Waste management
  • Hot spots
  • Joint ventures
  • Nuclear energy
  • Technical Information Center Oak Ridge Tennessee
Loading