National Technical Reports Library - NTRL

National Technical Reports Library

The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload PDF
Download

Development of the Direct Fabrication Process for Plutonium Immobilization.


DE2004783027

Publication Date 2001
Personal Author Congdon, J. W.; Marshall, K. M.
Page Count 36
Abstract The current baseline process for fabricating pucks for the Plutonium Immobilization Program (PIP) includes granulation of the milled feed prior to compaction. A direct fabrication process was demonstrated that eliminates the need for granulation. Feed preparation methods were developed and organic additives were selected to produce a milled feed that could be pressed and sintered to form high-density pucks acceptable for disposal in a repository. The critical process variables were optimized and the process limits for these variables were established. It was also demonstrated that by adjusting the sintering schedule, direct fabrication could produce good quality pucks from feeds containing impurities expected to be encountered in the immobilization process. In order to demonstrate the feasibility of the direct fabrication process, the following tasks had to be completed: (1) selection of a binder and determination of the amount of binder required to produce good quality pucks; (2) development of a procedure to add the binder prior to milling; (3) development of a method to charge the die with milled powder (this method had to minimize dusting to the glove box as the die is being charged); and (4) demonstration that the green strength of the pucks was adequate for remote handling. This report discusses the progress that has been made to develop and demonstrate these criteria.
Keywords
  • Radioactive waste processing
  • Plutonium
  • Fabrication
  • Immobilization
  • Radioactive waste disposal
  • Solidification
  • Vitrification
  • Waste forms
  • Savannah River Plant
  • Granular material
  • Binders
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors Westinghouse Savannah River Co., Aiken, SC. Savannah River Site.; Department of Energy, Washington, DC.
Supplemental Notes Sponsored by Department of Energy, Washington, DC.
Document Type Technical Report
NTIS Issue Number 200415
Development of the Direct Fabrication Process for Plutonium Immobilization.
Development of the Direct Fabrication Process for Plutonium Immobilization.
DE2004783027

  • Radioactive waste processing
  • Plutonium
  • Fabrication
  • Immobilization
  • Radioactive waste disposal
  • Solidification
  • Vitrification
  • Waste forms
  • Savannah River Plant
  • Granular material
  • Binders
  • Technical Information Center Oak Ridge Tennessee
Loading