National Technical Reports Library - NTRL

National Technical Reports Library

The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload XML
Download

Assembling and Installing LRUs for NIF.


DE200415007262

Publication Date 2003
Personal Author Bonanno, R. E.
Page Count 16
Abstract Within the 192 National Ignition Facility (NIF) beamlines, there are over 7000 large (40 x 40 cm) optical components, including laser glass, mirrors, lenses, and polarizers. These optics are held in large opto-mechanical assemblies called line-replaceable units (LRUs). Each LRU has strict specifications with respect to cleanliness, alignment, and wavefront so that once activated, each NIF beamline will meet its performance requirements. NIF LRUs are assembled, tested, and refurbished in on-site cleanroom facilities. The assembled LRUs weigh up to 1800 kilograms, and are about the size of a phone booth. They are transported in portable clean canisters and inserted into the NIF beampath using robotic transporters. This plug and play design allows LRUs to be easily removed from the beampath for maintenance or upgrades. Commissioning of the first NIF quad, an activity known as NIF Early Light (NEL), has validated LRU designs and architecture, as well as demonstrated that LRUs can be assembled and installed as designed. Furthermore, it has served to develop key processes and tools forming the foundation for NIF s long-term LRU production and maintenance strategy. As we look forward to building out the rest of NIF, the challenge lies in scaling up the production rate while maintaining quality, implementing process improvements, and fully leveraging the learning and experience gained from NEL. This paper provides an overview of the facilities, equipment and processes used to assemble and install LRUs in NIF.
Keywords
  • Containers
  • Lasers
  • Assembling
  • Installation
  • Equipment
  • National Ignition Facility
  • Line-replaceable units(LRUs)
  • Beam lines
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors Lawrence Livermore National Lab., CA.; Department of Energy, Washington, DC.
Supplemental Notes Sponsored by Department of Energy, Washington, DC.
Document Type Technical Report
NTIS Issue Number 200426
Assembling and Installing LRUs for NIF.
Assembling and Installing LRUs for NIF.
DE200415007262

  • Containers
  • Lasers
  • Assembling
  • Installation
  • Equipment
  • National Ignition Facility
  • Line-replaceable units(LRUs)
  • Beam lines
  • Technical Information Center Oak Ridge Tennessee
Loading