The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload PDF
Download

Strategic Planning for Hot Cell Closure.


DE2003805993

Publication Date 2001
Personal Author Langstaff, D. C.
Page Count 19
Abstract The United States Department of Energy (DOE) and its contractor were remediating a large hot cell complex to mitigate the radiological hazard. A Resource Conservation and Recovery Act (RCRA) closure unit was determined to he located within the complex. The regulator established a challenge to develop an acceptable closure plan on a short schedule (four months). The scope of the plan was to remove all excess equipment and mixed waste from the closure unit, establish the requirements of the legally binding Closure Plan and develop an acceptable schedule. The complex has several highly radioactive tanks, tank vaults, piping. and large hot cells containing complex chemical processing equipment. Driven by a strong need to develop an effective strategy to meet cleanup commitments, three principles were followed to develop an acceptable plan: (1) Use a team approach, (2) Establish a buffer zone to support closure, and (3) Use good practice when planning the work sequence. The team was composed of DOE, contractor, and Washington State Department of Ecology (Regulator) staff. The team approach utilized member expertise and fostered member involvement and communication. The buffer zone established an area between the unregulated parts of the building and the areas that were allegedly not in compliance with environmental standards. Introduction of the buffer zone provided simplicity, clarity, and flexibility into the process. Using good practice means using the DOE Integrated Safety Management Core Functions for planning and implementing work safely. Paying adcquate attention to detail when the situation required contributed to the process credibility and a successful plan.
Keywords
  • Hot cells
  • Decommissioning
  • Planning
  • Remedial action
  • Radiation hazards
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors Department of Energy, Richland, WA.; Department of Energy, Washington, DC. Assistant Secretary for
Supplemental Notes Sponsored by Department of Energy, Washington, DC. Assistant Secretary for Environmental Management.
Document Type Technical Report
NTIS Issue Number 200320
Strategic Planning for Hot Cell Closure.
Strategic Planning for Hot Cell Closure.
DE2003805993

  • Hot cells
  • Decommissioning
  • Planning
  • Remedial action
  • Radiation hazards
  • Technical Information Center Oak Ridge Tennessee