The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload PDF
Download

System Configuration Management Implementation Procedure for the Cold Vacuum Drying Facility Monitoring and Control System.


DE2003805643

Publication Date 2000
Personal Author Anglesey, M. O.
Page Count 34
Abstract The purpose of this document is to establish the System Configuration Management Implementation Procedure (SCMIP) for the Cold Vacuum Drying Facility (CVDF) Monitoring and Control System (MCS). This procedure provides configuration management for the process control system. The process control system consists of equipment hardware and software that controls and monitors the instrumentation and equipment associated with the CVDF processes. Refer to SNF-3090, Cold Vacuum Drying Facility Monitoring and Control System Design Description, HNF-3553, Annex B, Safety Analysis Report for the Cold Vacuum Drying Facility, and AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration. This SCMIP identifies and defines the system configuration items in the control system, provides configuration control throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of these items.
Keywords
  • Control systems
  • Monitors
  • Monitoring
  • Physical protection
  • Computer hardware
  • Computer software
  • Configuration
  • Verification
  • Cold Vacuum Drying Facility
  • SCMIP(System Configuration Management Implementation Procedure)
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors Fluor Hanford, Richland, WA.; Department of Energy, Washington, DC.
Supplemental Notes Sponsored by Department of Energy, Washington, DC.
Document Type Technical Report
NTIS Issue Number 200319
System Configuration Management Implementation Procedure for the Cold Vacuum Drying Facility Monitoring and Control System.
System Configuration Management Implementation Procedure for the Cold Vacuum Drying Facility Monitoring and Control System.
DE2003805643

  • Control systems
  • Monitors
  • Monitoring
  • Physical protection
  • Computer hardware
  • Computer software
  • Configuration
  • Verification
  • Cold Vacuum Drying Facility
  • SCMIP(System Configuration Management Implementation Procedure)
  • Technical Information Center Oak Ridge Tennessee
Loading