National Technical Reports Library - NTRL

National Technical Reports Library

The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload XML
Download

River Protection Project: Interface Management in the Multi-Contract Project Environment at Hanford.


DE2003804744

Publication Date 2000
Personal Author Shikashio, L. A.
Page Count 16
Abstract The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste 'product' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces.
Keywords
  • Radioactive waste management
  • Contract management
  • Contractors
  • Contracts
  • Radioactive waste storage
  • Storage facilities
  • River Protection Project
  • Interface management system
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors CH2M Hill Hanford Group, Inc., Richland, WA.; Department of Energy, Washington, DC. Assistant Secretary for
Supplemental Notes Sponsored by Department of Energy, Washington, DC. Assistant Secretary for Environmental Management.
Document Type Technical Report
NTIS Issue Number 200316
River Protection Project: Interface Management in the Multi-Contract Project Environment at Hanford.
River Protection Project: Interface Management in the Multi-Contract Project Environment at Hanford.
DE2003804744

  • Radioactive waste management
  • Contract management
  • Contractors
  • Contracts
  • Radioactive waste storage
  • Storage facilities
  • River Protection Project
  • Interface management system
  • Technical Information Center Oak Ridge Tennessee
Loading