The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload PDF
Download

Acceptance Test Procedure for New Pumping Instrumentation and Control Skid 'V'.


DE2003804481

Publication Date 2000
Personal Author Koch, M. R.
Page Count 66
Abstract This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as 'v'. The ATP will be performed after the construction of the PIC skid in the fabrication shop.
Keywords
  • Pumps
  • Skids
  • Control systems
  • Performance testing
  • Interim stabilization
  • Waste retrieval
  • Storage facilities
  • Measuring instruments
  • Control equipment
  • Tanks
  • Acceptance Test Procedure(ATP)
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors CH2M Hill Hanford Group, Inc., Richland, WA.; Department of Energy, Richland, WA.
Supplemental Notes Sponsored by Department of Energy, Richland, WA.
Document Type Technical Report
NTIS Issue Number 200318
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid 'V'.
Acceptance Test Procedure for New Pumping Instrumentation and Control Skid 'V'.
DE2003804481

  • Pumps
  • Skids
  • Control systems
  • Performance testing
  • Interim stabilization
  • Waste retrieval
  • Storage facilities
  • Measuring instruments
  • Control equipment
  • Tanks
  • Acceptance Test Procedure(ATP)
  • Technical Information Center Oak Ridge Tennessee
Loading