National Technical Reports Library - NTRL

National Technical Reports Library

The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload XML
Download

White sturgeon mitigation and restoration in the Columbia and Snake Rivers upstream from Bonneville Dam. annual progress report, April 1999-March 2000.


DE2001782228

Publication Date 2001
Personal Author Ward, D. L.
Page Count 151
Abstract We report on our progress from April 1999 through March 2000 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. The study is a cooperative effort by the Oregon Department of Fish and Wildlife (ODFW; Report A), Washington Department of Fish and Wildlife (WDFW; Report B), U.S. Geological Survey Biological Resources Division (USGS; Report C), Columbia River Inter-Tribal Fish Commission (CRITFC; Report D), and the U.S. Fish and Wildlife Service (USFWS; Report E). This is a multi-year study with many objectives requiring more than one year to complete. Therefore, findings from a given year may be part of more significant findings yet to be reported.
Keywords
  • Fishes
  • Mitigation
  • Restoration
  • Dams
  • Rivers
  • Annual reports
  • White sturgeon
  • Snake River
  • Columbia River
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors Bonneville Power Administration, Portland, OR.; Department of Energy, Washington, DC.
Document Type Technical Report
NTIS Issue Number 200125
Contract Number
  • 1986BP63584
White sturgeon mitigation and restoration in the Columbia and Snake Rivers upstream from Bonneville Dam. annual progress report, April 1999-March 2000.
White sturgeon mitigation and restoration in the Columbia and Snake Rivers upstream from Bonneville Dam. annual progress report, April 1999-March 2000.
DE2001782228

  • Fishes
  • Mitigation
  • Restoration
  • Dams
  • Rivers
  • Annual reports
  • White sturgeon
  • Snake River
  • Columbia River
  • Technical Information Center Oak Ridge Tennessee
  • 1986BP63584
Loading