The National Technical Information Service acquires, indexes, abstracts, and archives the largest collection of U.S. government-sponsored technical reports in existence. The NTRL offers online, free and open access to these authenticated government technical reports. Technical reports and documents in its repository may be available online for free either from the issuing federal agency, the U.S. Government Publishing Office’s Federal Digital System website, or through search engines.




Details
Actions:
Download PDFDownload PDF
Download

Utility advanced turbine systems (ATS) technology readiness testing phase 3 restructured (3r).


DE2001780452

Publication Date 2000
Page Count 11
Abstract Much of the 'H' technology design is based on proven, established technologies. The major technologies of the combined cycle powertrain, including the bearing designs, the evaluation methods for rotor dynamics, the compressor and turbine blading designs, and the generator field construction methods are all either direct applications of proven design technology or evolutionary refinement of existing designs. It is for these reasons that GE expects that the reliability of the new 'H' Class generating system will be fully commensurate with the levels associated with today 'F' Class combined cycle power plants. With maintenance and operations performed at 'best practice' levels, the new 'H' Class plant should reach its full reliability potential of 97.0% or better.
Keywords
  • Combined-cycle power plants
  • Turbines
  • Technology
  • Bearings
  • Combined cycles
  • Compressors
  • Construction
  • Evaluation
  • Maintenance
  • Rotors
  • Testing
Source Agency
  • Technical Information Center Oak Ridge Tennessee
Corporate Authors Federal Energy Technology Center, Morgantown, WV.; Department of Energy, Washington, DC.
Document Type Technical Report
NTIS Issue Number 200125
Contract Number
  • FC21-95MC31176
Utility advanced turbine systems (ATS) technology readiness testing phase 3 restructured (3r).
Utility advanced turbine systems (ATS) technology readiness testing phase 3 restructured (3r).
DE2001780452

  • Combined-cycle power plants
  • Turbines
  • Technology
  • Bearings
  • Combined cycles
  • Compressors
  • Construction
  • Evaluation
  • Maintenance
  • Rotors
  • Testing
  • Technical Information Center Oak Ridge Tennessee
  • FC21-95MC31176
Loading